GAZ-SYSTEM: Baltic Pipe with another location decision

On June 21, 2019, the West Pomerania Province Governor signed the decision on establishing the location for the construction of the Baltic Pipe infrastructure.
The investment will consist in the design, construction and operation of a gas pipeline from the Płoty transmission station to the Goleniów compressor station along with the extension of the Płoty transmission station.