Gas pipeline connecting the Baltic Pipe with the National Transmission System

Depending on the selected route of the offshore gas pipeline and its landfall on the Baltic coast, the following routing options are envisaged possible for the planned gas pipeline connecting the offshore gas pipeline with the National Transmission System (red line):

  • location (option):
    • section of the Niechorze-Płoty gas pipeline: Zachodniopomorskie Voivodeship, Rewal, Karnice, Trzebiatów, Gryfice, Płoty communes
    • section of the Rogowo-Płoty gas pipeline: Zachodniopomorskie Voivodeship, Trzebiatów, Gryfice, Płoty communes
    • section of the Gąski-Koszalin gas pipeline: Zachodniopomorskie Voivodeship, Mielno, Będzino, Biesiekierz communes
  • onshore gas pipeline from the first dry weld to the Receiving Terminal – nominal diameter of the gas pipeline DN 900 mm
  • onshore gas pipeline from the Receiving Terminal to the existing Goleniów Gas Compressor Station – nominal diameter of the gas pipeline DN 1000 mm
gazociag_polaczenie-z-KSP_mapa_www_ENG

Key facts

- estimated length

85-90 km

– estimated length
- diameters of the gas pipelines

900 and 1000 mm

– diameters of the gas pipelines
- operating pressure

8,4 MPa

– operating pressure

Engineering contractor

PGNiG Gazoprojekt  S.A. and ILF Consulting Engineers Polska Sp. z o.o.

Consortium of

PGNiG Gazoprojekt S.A.
and
ILF Consulting Engineers Polska Sp. z o.o.

Schedule

2020 - obtaining the building permit2022 - construction completion date
2020 – obtaining the building permit

2022 – construction completion date